Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Guangzhou Changfeng Steel Co., LTD
Home ProductsPlastic Mold Steel

SAE1050 / S50C / P20 Standard Metal Mold Base For Injection Plastic Gloss Finish

China Guangzhou Changfeng Steel Co., LTD certification
China Guangzhou Changfeng Steel Co., LTD certification
Gold supplier! Arranged shipment very fast, quality is super good. They are one of our best suppliers, will do more business with them in the future!

—— Ms Nguyen Thi Hong

We bought 7 containers from them in 2017, no quality problems. The boss is very nice and professional, good business parner!

—— Mr. Wan Rusli

Good job! Shipment was arranged fast, giving lots of good suggestions before place order, saved me time and money.

—— Mrs. Natntia Jitaniyompanich

I'm Online Chat Now

SAE1050 / S50C / P20 Standard Metal Mold Base For Injection Plastic Gloss Finish

large.img.alt
small.img.alt small.img.alt

Large Image :  SAE1050 / S50C / P20 Standard Metal Mold Base For Injection Plastic Gloss Finish

Product Details:
Place of Origin: CHINA
Brand Name: Changfeng
Certification: ISO/ SGS
Model Number: S50C/P20
Payment & Shipping Terms:
Minimum Order Quantity: 1 SET
Price: As per your drawing
Packaging Details: wooden case
Delivery Time: 25-35 days
Payment Terms: L/C, T/T
Supply Ability: 30 sets per month
Detailed Product Description
Grade: S50C/P20 Specification: Customized
Type:: Plastic Injection Usage: Molding
Surface: Gloss Finish Standard: HASCO, DME, MISUMI
High Light:

mould steel material

,

p20 mold steel

S50C/P20/1.2311 injection plactic mold base

 

Mould making steps:
1. Samples/Drawing &Requirement from you
2. Mould design:we will Communicate and Exchange the opinion with you after you place order.
3. Material Purchase:Steel cutting and Mould base tooling.
4. Assembling.
5. Inspection of mould : following and controlling the tooling processing.
6. Mould testing:We will inform you the date.

Than will send the sample's inspection report&injection parameters with the sample to you!
7. Your instruction &confirmation for shipment.
8. Ready made mould before packing.

 

 

TOLERANCES FOR STANDARD MOULD PLATES

 

  Top Clamping Plate(Side Gate System) AB Plate Stripper Plate (Side Gate System) Support Plate Bottom Clamping Plate(Pin point Gate System) Top Clamping Plate(Pin point Gate System) Stripper Plate (Pin point Gate System) Stripper Plate Ejector Retainer Plate & Ejector Plate Spacer Block
Thickness +0.5~0 +0.4~+0.1
Width +0~-0.2 +1.0~0 +0.5~0 -1.5~+0.5
Length +0~-0.2 +1.0~0 +0~0.2
Perpendicularity 0.05/300 Datum corners:0.01/100 0.05/300 Datum corners:0.01/100 0.05/300 0.1/300
Datum corners:0.05/300 Datum corners:0.05/300
Parallelism 0.01/100
Chamfer(Plate width: 150-270mm) C1.5~C2.0
Chamfer(Plate width≥300mm) C2.0~C3.0

 

 

Q. How long is the lead time for mold?

A : It depends on the mold’s size and complexity. Normally, the lead time is 25-35 days. If the molds are very simple and not in big size, we can work out with 15 days.

 

Q. Before shipment, how to make sure the products quality?

A : We are specialized in high quality products. We have QC to inspect the products before each shipment. You can come to visit our factory or ask a third party for inspection. Or we can send you videos to show the production process.

 

Q. How could I pay them?

A : T/T, L/C are acceptable.

 

Q. Can I get discounts?

A : Yes, for big order, old customer and frequent customers, we give reasonable discounts.

 

Q. Which Shipment way is available?

A : By sea to your nearest port.

By air to your nearest airport.

By express (DHL, UPS, FEDEX, TNT, EMS) to your door.

 

SAE1050 / S50C / P20 Standard Metal Mold Base For Injection Plastic  Gloss Finish 0

Contact Details
Guangzhou Changfeng Steel Co., LTD

Contact Person: Echo

Tel: +8613535323261

Send your inquiry directly to us (0 / 3000)